This document details a high-performance server configuration optimized for Continuous Integration/Continuous Deployment (CI/CD) pipelines. This configuration balances processing power, memory capacity, storage speed, and network bandwidth to provide a robust and responsive platform for automated software builds, testing, and deployment. This document assumes a moderately large development team (50-150 developers) and a complex software stack. Smaller teams may benefit from scaled-down versions; larger teams will likely require clustered solutions (see Server Clustering).
1. Hardware Specifications
This CI/CD server utilizes a dual-socket server architecture to maximize core count and memory bandwidth. The specifications below represent a single server node; scaling horizontally via clustering is recommended for larger organizations.
CPU: Dual Intel Xeon Gold 6348 (28 cores/56 threads per CPU, 3.0 GHz base frequency, 3.5 GHz Turbo Boost Max Frequency 3.0). Total: 56 cores / 112 threads. This processor was selected for its high core count and AVX-512 instruction set, beneficial for code compilation and analysis. CPU Architecture details the importance of core count and instruction sets.
RAM: 512 GB DDR4 ECC Registered 3200MHz RDIMM (16 x 32 GB modules). ECC memory is crucial for data integrity during long compilation and testing processes. 3200MHz provides a good balance between cost and performance. Memory Technologies provides a deeper dive into RAM specifications.
Storage:
- Boot Drive: 1TB NVMe PCIe Gen4 x4 SSD (Samsung 980 Pro). Used for the operating system and essential system files. Provides fast boot times and responsiveness.
- Build Cache/Artifact Storage: 2 x 4TB NVMe PCIe Gen4 x4 SSD (Intel Optane P4800X). These drives are used to store build artifacts, dependency caches, and intermediate build results. Optane is preferred for its low latency and high endurance, critical for frequent read/write operations. Storage Technologies details SSD types and their performance characteristics.
- Version Control System (VCS) Storage: 8 x 16TB SAS 12Gbps 7.2K RPM HDD in RAID 6. Used for storing the complete version control history (Git, Mercurial, etc.). SAS HDDs provide a good balance of capacity, reliability, and cost for large repositories. RAID 6 ensures data redundancy and availability. RAID Configurations provides information on various RAID levels.
- Test Data Storage: 4 x 8TB SAS 12Gbps 7.2K RPM HDD in RAID 10. Used for storing large test datasets and test environments. RAID 10 provides a good balance of performance and redundancy.
Network Interface Cards (NICs):
- Management NIC: 1 x 1 GbE. For basic server management.
- Data Transfer NIC: 2 x 100 GbE (Mellanox ConnectX-6 Dx). Essential for fast cloning of repositories, transferring build artifacts, and communicating with deployment targets. Network Topologies provides details on network infrastructure. Teaming/Bonding is configured for redundancy and increased bandwidth.
Power Supply: 2 x 1600W 80+ Titanium Redundant Power Supplies. Redundancy ensures continued operation in case of PSU failure. Titanium efficiency maximizes energy savings. Power Supply Units details PSU specifications.
Chassis: 2U Rackmount Server Chassis with Hot-Swappable Fans. Designed for high density and ease of maintenance.
RAID Controller: Broadcom MegaRAID SAS 9460-8i. Supports RAID levels 0, 1, 5, 6, and 10. RAID Controllers details controller functionality.
Motherboard: Supermicro X12DPG-QT6. Supports dual Intel Xeon Scalable processors, large memory capacity, and multiple PCIe slots.
Operating System: Ubuntu Server 22.04 LTS. Chosen for its stability, security, and large community support. Linux Distributions provides a comparison of various Linux distributions.
Virtualization (Optional): VMware ESXi 7.0 or Proxmox VE 7.x can be used for virtualization of build agents and test environments. Virtualization Technologies explains the benefits of virtualization.
2. Performance Characteristics
The performance of a CI/CD server is measured by several key metrics: build time, test execution time, artifact storage access speed, and network transfer speed. The following benchmark results are based on a representative software project (a large Java application with extensive unit and integration tests).
Build Time (Java Project - Maven):
- Clean Build: 15-20 minutes.
- Incremental Build: 2-5 minutes.
- Dependency Download (First Time): 5-10 minutes (cached for subsequent builds).
Test Execution Time (Unit & Integration Tests):
- Total Test Suite: 45-60 minutes.
- Parallelized Tests (using 32 cores): 20-30 minutes.
Artifact Storage (Read/Write Speed):
- Sequential Read Speed (NVMe): Up to 7000 MB/s.
- Sequential Write Speed (NVMe): Up to 5500 MB/s.
- IOPS (NVMe): Up to 800,000.
Network Transfer Speed (100 GbE):
- Repository Cloning (Large Repository): 5-10 minutes.
- Artifact Transfer (Large Artifact): Seconds.
Real-world Performance Observations:
- This configuration provides significantly faster build and test times compared to using traditional spinning disk storage or slower network connections.
- The large memory capacity allows for running multiple build agents and test environments concurrently without performance degradation. Resource Management details techniques for optimizing resource allocation.
- The NVMe storage for build caches drastically reduces build times by eliminating the need to re-download dependencies.
- The 100 GbE network connection ensures that repository cloning and artifact transfer are not bottlenecks in the CI/CD pipeline.
- CPU utilization consistently remains high during build and test processes, indicating that the CPU is a key performance driver.
- The Optane drives contribute significantly to the overall responsiveness of the CI/CD system, particularly during frequent small read/write operations.
3. Recommended Use Cases
This configuration is ideal for:
- **Large Software Projects:** Projects with complex build processes, extensive test suites, and large codebases.
- **Microservices Architectures:** Building, testing, and deploying numerous microservices concurrently.
- **Mobile App Development:** Building and testing mobile applications for multiple platforms (iOS, Android).
- **Game Development:** Compiling game assets and running automated tests.
- **Data Science and Machine Learning:** Training and deploying machine learning models.
- **Organizations with High Throughput Requirements:** Teams that need to perform frequent builds and deployments throughout the day.
- **Automated Infrastructure as Code (IaC):** Running tools like Terraform or Ansible for automated infrastructure provisioning.
4. Comparison with Similar Configurations
Here's a comparison of this CI/CD server configuration with two alternative configurations: a mid-range configuration and a high-end configuration.
Feature | Low-End (Cost-Effective) | Mid-Range (Balanced) | High-End (Performance Optimized) |
---|---|---|---|
CPU | Dual Intel Xeon Silver 4310 (12 cores/24 threads) | Dual Intel Xeon Gold 6348 (28 cores/56 threads) | Dual Intel Xeon Platinum 8380 (40 cores/80 threads) |
RAM | 128 GB DDR4 ECC Registered 3200MHz | 512 GB DDR4 ECC Registered 3200MHz | 1 TB DDR4 ECC Registered 3200MHz |
Boot Drive | 500GB NVMe PCIe Gen3 | 1TB NVMe PCIe Gen4 | 2TB NVMe PCIe Gen4 |
Build Cache/Artifact Storage | 1TB NVMe PCIe Gen3 | 2 x 4TB NVMe PCIe Gen4 (Optane) | 4 x 8TB NVMe PCIe Gen4 (Optane) |
VCS Storage | 4 x 8TB SAS 7.2K RPM (RAID 5) | 8 x 16TB SAS 12Gbps 7.2K RPM (RAID 6) | 16 x 16TB SAS 12Gbps 7.2K RPM (RAID 6) |
Test Data Storage | 2 x 4TB SAS 7.2K RPM (RAID 1) | 4 x 8TB SAS 12Gbps 7.2K RPM (RAID 10) | 8 x 16TB SAS 12Gbps 7.2K RPM (RAID 10) |
Network | 1 x 10 GbE | 2 x 100 GbE | 4 x 100 GbE |
Power Supply | 2 x 850W 80+ Gold | 2 x 1600W 80+ Titanium | 2 x 2000W 80+ Titanium |
Approximate Cost | $10,000 - $15,000 | $25,000 - $35,000 | $50,000+ |
Ideal Use Case | Small teams, simple projects | Medium-sized teams, moderately complex projects | Large teams, complex projects, high throughput requirements |
Notes:
- Costs are estimates and can vary based on vendor and location.
- The low-end configuration is suitable for smaller teams and simpler projects with less demanding requirements.
- The mid-range configuration (detailed in this document) provides a good balance of performance and cost for most organizations.
- The high-end configuration is designed for organizations with extremely high throughput requirements and complex projects. Cost Optimization details strategies for reducing server costs.
5. Maintenance Considerations
Maintaining a CI/CD server requires proactive monitoring and regular maintenance to ensure optimal performance and availability.
Cooling: This server configuration generates a significant amount of heat due to the high-performance CPUs and storage devices. Adequate cooling is essential.
- Data Center Cooling: The server should be housed in a data center with sufficient cooling capacity.
- Airflow Management: Ensure proper airflow within the server chassis. Cable management is crucial for maintaining airflow.
- Fan Monitoring: Monitor fan speeds and temperatures regularly. Replace failed fans promptly. Thermal Management details cooling solutions.
Power Requirements: The dual 1600W power supplies provide ample power, but it's important to ensure that the data center power infrastructure can support the server's power draw.
- Dedicated Circuit: Ideally, the server should be connected to a dedicated power circuit.
- UPS (Uninterruptible Power Supply): A UPS is recommended to protect against power outages. Power Redundancy details power backup solutions.
Storage Maintenance:
- RAID Monitoring: Monitor the RAID array for disk failures and rebuild progress.
- Disk Health Checks: Perform regular SMART tests to monitor disk health.
- Data Backups: Implement a robust data backup strategy to protect against data loss. Data Backup Strategies details backup methodologies.
Software Updates:
- Operating System Updates: Apply security updates and bug fixes regularly.
- Firmware Updates: Update server firmware (BIOS, RAID controller, NIC firmware) to ensure optimal performance and stability.
- CI/CD Tool Updates: Keep the CI/CD tools (Jenkins, GitLab CI, CircleCI, etc.) up to date. Software Lifecycle Management details the importance of software updates.
Monitoring:
- System Monitoring: Monitor CPU usage, memory usage, disk I/O, and network traffic.
- Application Monitoring: Monitor the performance of the CI/CD tools and build agents.
- Log Analysis: Analyze system logs and application logs to identify potential issues. System Monitoring Tools provides a review of monitoring software.
Physical Security: Ensure the server is physically secure to prevent unauthorized access.
Regular Audits: Perform regular security audits and vulnerability scans.
Server Hardware Maintenance provides a general overview of server maintenance procedures. ```
Intel-Based Server Configurations
Configuration | Specifications | Benchmark |
---|---|---|
Core i7-6700K/7700 Server | 64 GB DDR4, NVMe SSD 2 x 512 GB | CPU Benchmark: 8046 |
Core i7-8700 Server | 64 GB DDR4, NVMe SSD 2x1 TB | CPU Benchmark: 13124 |
Core i9-9900K Server | 128 GB DDR4, NVMe SSD 2 x 1 TB | CPU Benchmark: 49969 |
Core i9-13900 Server (64GB) | 64 GB RAM, 2x2 TB NVMe SSD | |
Core i9-13900 Server (128GB) | 128 GB RAM, 2x2 TB NVMe SSD | |
Core i5-13500 Server (64GB) | 64 GB RAM, 2x500 GB NVMe SSD | |
Core i5-13500 Server (128GB) | 128 GB RAM, 2x500 GB NVMe SSD | |
Core i5-13500 Workstation | 64 GB DDR5 RAM, 2 NVMe SSD, NVIDIA RTX 4000 |
AMD-Based Server Configurations
Configuration | Specifications | Benchmark |
---|---|---|
Ryzen 5 3600 Server | 64 GB RAM, 2x480 GB NVMe | CPU Benchmark: 17849 |
Ryzen 7 7700 Server | 64 GB DDR5 RAM, 2x1 TB NVMe | CPU Benchmark: 35224 |
Ryzen 9 5950X Server | 128 GB RAM, 2x4 TB NVMe | CPU Benchmark: 46045 |
Ryzen 9 7950X Server | 128 GB DDR5 ECC, 2x2 TB NVMe | CPU Benchmark: 63561 |
EPYC 7502P Server (128GB/1TB) | 128 GB RAM, 1 TB NVMe | CPU Benchmark: 48021 |
EPYC 7502P Server (128GB/2TB) | 128 GB RAM, 2 TB NVMe | CPU Benchmark: 48021 |
EPYC 7502P Server (128GB/4TB) | 128 GB RAM, 2x2 TB NVMe | CPU Benchmark: 48021 |
EPYC 7502P Server (256GB/1TB) | 256 GB RAM, 1 TB NVMe | CPU Benchmark: 48021 |
EPYC 7502P Server (256GB/4TB) | 256 GB RAM, 2x2 TB NVMe | CPU Benchmark: 48021 |
EPYC 9454P Server | 256 GB RAM, 2x2 TB NVMe |
Order Your Dedicated Server
Configure and order your ideal server configuration
Need Assistance?
- Telegram: @powervps Servers at a discounted price
⚠️ *Note: All benchmark scores are approximate and may vary based on configuration. Server availability subject to stock.* ⚠️